Basing House
Basing House – Student Accommodation Upgrade
This project at Cambridge involved the upgrade of existing student accommodation, with a focus on improving thermal performance and long-term durability. The aim was to enhance comfort for occupants while bringing the building up to a higher energy standard.
The central location presented logistical challenges, including restricted access and a busy surrounding environment, requiring careful planning and coordination throughout the works.
We carried out the installation of new high-performance windows, manufactured by our sister company Precision Carpentry & Joinery, alongside external insulation and a full rendering system. Each element was selected to improve efficiency while ensuring a robust, long-lasting finish.
The completed project delivers a more energy-efficient building with improved internal comfort, designed to perform reliably over the long term.
Planning a Building Project in Cambridgeshire or Suffolk?
Whether you have detailed drawings or just an early idea, we're happy to talk it through. Get in touch with the PCJ Construction team to arrange a free site visit, consultation and no-obligation quote.
Book a call